Basic Specifications

No

Title

Item

Standard Properties

Comments

1

Purpose of Lining

 

1.       Restore Pipeline strength
2.       Stop leakage
3.       Improve flow capacity
4.       Improve corrosion resistance
5.       Prevent tree roots from entering the pipeline
6.       Re-establish pipeline grade
7.       Improve resistance to earthquake damage

Grade can be re- established for pipes over 800mm in diameter

2

Suitability of SPR Method

Pipeline Function

Sewer, agricultural, drainage

 

Shape of Pipe

Round, rectangular, horse-shoe, oval etc

 

Pipeline length

Host Pipe Shape Size (mm) Maximum
Length (m)
 

Round

 

900

1000 to 1500

1650 to 3000

200

300

500

Installable length can be extended if necessary.

Rectangular

900 to 1200

1300 to 2100

2200 to 3000

200

300

500

 

Horse-shoe

900 to 1200

1300 to 2100

2200 to 3000

200

300

500

 

Degree of Deterioration

Condition of Host

Yes or No
for SPR

 

Breakage of Pipe

Collapse

Partially missing

Cracked Entirely

No

Yes

Yes

 

Cracking

Horizontal and vertical

Yes

 

Loosen

Joint

Gap or joint apart

Yes

Depends on degree of movement. May need partial repair

Offset

・ <20mm

・ <50mm

・ <100mm

・ <150mm

 

 

 

 

Host <500mm diameter

Host 600 to 1200mm

Host 1350 to 1800mm

Host > 2000mm

Bend Angle

Less than 5°(Pushing)

Less than 10°(Self Running)

Less than 3°(Out-of-Round)

Yes

Yes

Yes

 

Meandering

 

Yes

Depending on site conditions

Condition of Host

 

Yes or No for SPR

 

Infiltration

Pressurized (spouting)



Non Pressurized

Need separate work to stop water.

Yes

Need separate work to stop water.

Protruding Mortar

 

Needs pretreatment

 

Protruding Laterals

 

Needs pretreatment

 

Tree Roots in Line

 

Needs pretreatment

 

Corrosion of Host

Steel bars exposed

Yes

Exposed bars shall be cut by robot

3

Working Conditions

Minimum Work Space

One lane of traffic.
Winging: about 3 meters wide x 20 meters long
Grouting: about 3 meters wide x 36 meters long

 

Safety Devices

Safety harness
Gas detector
Forced air ventilation
Lighting

 

Working Temperature

Outside temperature: -5 to 40°C

 

Installation time

Shape of Pipe

Host Pipe Diameter (mm)

Days per 100m

 

Round

900 to 1500

1650 to 2200

2400 to 3000

14 to 18

16 to 17

22 to 27

Self Running

Self Running

Self Running

Square

900 to 1200

1300 to 2100

2200 to 3000

16 to 17

18 to 21

25 to 29

Pretreatment including restoration of invert in camber and lateral reconnection no included.

Horse-shoe

900 to 1200

1300 to 2100

2200 to 3000

18

18 to 21

24 to 28

 

Flow in line

Liner can be wound while pipeline is in service. Flow level should not be more than about 30% of pipe diameter and flow velocity less than 10m/s

 

Winding Direction

From upstream to downstream

Bypassing may be necessary to reverse direction

 